The 4X4's were measured and cut and placed into the blocks. Leveling from
the pool out seemed to be the easiest way. This was done to ensure that each
row was leveled.
After completing each row I placed the 2x6x10 joists on top of the 4x4 post but
did not screw them in. The joists run parallel to the pool. I cross-braced the
perimeter and after it was cross-braced the deck seem too large so I omitted
the last row of Dek-blocks as seen in the last photo.